Indian Railway main logo
Search :
Increase Font size Normal Font Decrease Font size
   View Content in Hindi
National Emblem of India

About Us

Tenders & Suppliers Info

News & Recruitment

Public Information

Passenger Information

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS

ELECTRICAL

1.

ORGANIZATION

Gazetted

Sr. D.E.E. (G) SUR

Shri  V.K.Singh

DEE (TRD) SUR

Shri  Yogesh Kumar Shingh

A.D.E.E.(G) SUR

Shri  K.K.Rajput

A.D.E.E/TRD/ANG

Shri  J.B.Rai

Non-Gazetted (General Service)

Description

Sanction

On roll

Vacancy

Train Lighting

259

195

64

Genl. Power Supply

269

256

13

Sr. DEE Office

19

12

07

Total

547

463

84

Non-Gazetted (TRD)

Description

Sanction

On roll

Vacancy

Supervisor (TRD)

14

09

05

Artisan (TRD)/Group D

96

27

69

Group D Staff

0

58

-58

Total

110

94

16

2.

ELECTRICAL ASSETS

22 KV Sub Stations

: 05      ( Daund- Power house, F type, Hanuman Mandir,C&W and Sonawadi Pump house )

11 KV Sub Stations

: 22   

Electrical Pumps

: 341  

D.G. Sets

: 34    

A.C. Units Window Type

: 94

A.C. Units Split Type

: 163

Water coolers

: 157

Refrigerators

: 08

Transformers

: 66

2.1 KVA portable generators

: 114

High Mast

: 65

Centralized Air Cooling Units

: 23

Nos. of Escalators

: 02 ( Gulbarga )

Nos. of Lifts

: 04 ( Daund )

3.

SUPPLY POINTS

HT Supply (sub-stations)

: 18

LT Supply

: 367

Direct Connections

: 761

4.

STAND-BY SUPPLY

At  stations by generator

(capacity ranging from 20 to 320 KVA)

: 12 (WD, SDB,GR, SUR,KWV,  PVR

       DD, ANG, LUR, BAP, KPG & SNSI)

:  66 with 2.1 KVA portable Gen-set provided.

At PRS’s  by generators

:  4 (UMD, PVR, LUR, JH)

5.

PASSENGER AMENITIES

No. of stations electrified

: 90

Stations having water coolers

: 20

Stations having electrical pumps

: 74

Stations - A.C. Retiring rooms.

: 03 (Solapur, Gulbarga, Pandharpur)

Modern stations

: 01 (Kurduwadi)

Model Stations

: 05

Adarsh Stations

: 10

Touch & Feel stations

: 05

Stations having T.L. Battery Charging facilities.

: 07

Stations having A/C coach pre-cooling arrangements

: 08

6.

NON CONVENTIONAL SOURCES OF ENERGY

Solar water heaters

: 24

Solar Emergency lights by LED system (Standby)

: 36  Stations  

: 162  LC Gates  

Solar Emergency Street lights

: 57(in Railway colonies)

Solar Emergency hand lamps

: 81 (Used by Gatemen)

Solar Stud lights

: 12 (Running Room, Solapur)

Solar Refrigerator

: 1 (Running Room, Solapur)

Solar Panel/ Solar Pump

: 11

10 KWp solar grid connecting system

: 1 (Railway Hospital Solapur)

Green stations

: 3(Tikekarwadi – 2 KW, Sangola – 4 KW & Rahuri 3KWp)

7.

TRAIN LIGHTING MAINTENANCE & A.C. COACH MAINTENANCE

Holding

Pass. TL & other coaches

AC coaches

Total

Holding BG

228

45

273

7.1

Rakes for Primary maintenance:

Station

No. of Rakes

Name of train

No. of AC coaches

Solapur

4

4

Siddeshwar Express12115/12116,

Udyan Exp. 16529/16530

SUR-KOP Exp11051/11052,

 KOP-HYB Exp.11303/11304

1- WGFACCW ,

3 - WGACCW &

2-WGACCN per rake  

1 - WGACCW &

1-WGACCN per rake  

2

Hutatma Express12157/12158

1 – WGCZAC

2

SUR – YPR22133/22134

1 FACCW, 1 ACCW, 1 ACCN

1

SUR – UBL

NIL

PA-BSL Exp 11025/11026

11423/11424

 SUR-Hubil Exp

SUR-MRJ Exp 11309/11310

GR

1

Gulbarga- Secundrabad Exp 11307/11308

01 WGACCZ

2 Spare coaches

1 ACCN 1 ACCW

7.2

Depotwise Holding:

Depot

SUR

DD

WD

GR

TOTAL

No. of Rakes

13

0

-

1

16

No. of AC coaches

44

-

-

1

45

No. of TL coaches

206

0

-

12

228

Total Coaches

263

0

-

13

273

Other coaches ( BDT+Saloon )

06

06

06

0

18

Grand Total

269

06

06

13

291

7.3

Self generating AC Coaches

Depot

Type of AC coach

Holding

Solapur

WGACCW

20

WGACCN

16

WGFAC

06

WGCZAC

02

Gulberga

WGCZAC

01

Total

45

7.4

RBPC Maintenance

Station

Train no.

Name of train

No.of AC coaches

LUR

22107/22108

CTSM-LUR EXP.

1- WGACCN, 1- WGFACCW, 1-WGFAC

7.5

Rakes for RBPC maintenance:- PVR- 01 , WD-01, LUR- 01, SNSI -  

Depot

SNSI

LUR

PVR

WD

 *Total No.of Rakes

14

3 tri- weekly,

2bi-weekly

8- weekly

       1-daily

02

01 daily

02

01 tri weekly

04

 01 daily

LUR

1) 22108/22107 (CSTM-LUR) - Daily

SNSI :- 1)12131/12132 (DR–SNSI)  Tri W

3) 16217/16218 (MYS-SNSI) weekly

5) 17205/17206 (CCT – SNSI) Tri weekly

9) 22601/22602 ( MAS-SNSI) weekly

11) 18503/18504 ( VSKP-SNSI ) weekly

13) 51033/51034 (MB-SNSI Daily ),

2) 22893/22894 (HWH – SNSI) weekly

4) 18407/18408 PURI-SNSI weekly

6) 22455/22456 KLk-SNSI bi weekly

8) 17001/17002 (SC – SNSI)  Bi weekly

10) 17207/17208 ( Vijayawada-SNSI) weekly

12) 17417/17418 TPTY-SNSI weekly

14) 11001/11002 (SNSI-PVR) Tri weekly

PVR:- 1)51027/51028 (CSTM-PVR).

9

PERFORMANCE OF ELECTRICAL DEPARTMENT

9.1

PUNCTUALITY LOSS ON ACCOUNT OF TRAIN LIGHTING & AIR CONDITIONING :

Item

           2016-17

          2017-2018

Punctuality loss (Territorial) on TL account

0

0

Punctuality loss (Territorial) on AC account

0

0

Punctuality loss (Ownership) on TL account

1

1

Punctuality loss (Ownership) on AC account

1

1

9.2

PERFORMANCE :

Cumulative electrical consumption up to the period March 2017 is 14.696 million units as compared to 15.901 million units for the same period of last year 2015-16. Thus, there is a total decrease in energy consumption by -1.205 million units (- 7.58%) as compared to same period of last year.

· 

Rs 5,93,913 /- have been saved during the month of  March 2017  towards SEB’s electric bill payment in the division due to PF rebate, NCA & timely payment incentive with cumulative saving of Rs. 70,61,699 /- during the current financial year.

· 

There is no train detention on AC & TL account (ownership basis) during this year.

Electrical Energy consumption and specific energy consumption comparative figures are as under:-

9.3

ELECTRICAL ENERGY CONSUMPTION & CONNECTED LOAD :

Year ending

Consumption

in MU

% increase

 in E.E Units

Average

Connected

Load in KW

Increase in connected load

SEC

In KW

In %

31.03.08 (12 months)

14.712

3.88%

12914

484

3.89 %

94.93

31.03.09 (12 months)

15.768

7.18%

13675

761

5.89 %

96.09

31.03.10 (12 months)

16.345

3.66%

14241

566

4.14 %

95.64

30.03.11 (12 months)

16.214

- 0.85%

15273

1032

7.25 %

88.47

31.03.12 (12 months)

17.322

6.83%

16040

767

5.02%

89.99

31.03.13 (12 months)

17.642

1.85%

16877

837

5.22%

 87.11

31.03.14(12 months)

17.431

-1.20%

17305

428

2.54%

83.94

31.03.15(12 month)

17.381

- 0.29%

17604

299

1.73%

82.28

31.03.16(12 month)

17.321

-0.345%

17927

323

1.834%

80.52

31.03.16 ( 12 Months)

      10.969

-18.472%

18042

108

0.598%

67.51

31.03.2017 ( 12 Months )

14.690

-8.089

18105

169

0.149 %

73.76

9.4

DEVELOPMENT /IMPROVEMENT WORKS ON ACTION PLAN ITEMS :

Sr.No

Items

2016-17

2017-18

1)

Proliferation of energy efficient lights namely  T5 in large No.

a)

Service Buildings

00

264

b)

Staff quarters

00

146

2

Rewiring of staff quarters.

00

60

3

Energy Audit

00

05

4

Provision of LED based station name board in placed of neon sign board.

00

10

5

Automation of pumps

00

00

14

GENERAL POWER SUPPLY

S N

Key Area

14-15

(Avg.)

15-16

(Avg.)

16-17

(Up to July 14)

March 17

Remarks on trend

1

Failure of DG sets for station lighting and PRS

Nil

Nil

Nil

Nil

2

Energy consumption cumulative from April 2012 to Sep’ 2013  month

17.381

MU 

17.321

MU

14.690

MU

1.223

MU

Decrease in energy consumption by -7.45 % on cumulative basis March 2017.

3

Energy consumption (average per month)

1.448

MU

1.443

MU

1.335

MU

--

Decrease in energy consumption by -7.48 % on average basis up to March 2017

Electrical Departmentof Solapur Division.

Achievements:

1

 02 Nos of projects received certificate of merit for below mentioned works for energy conservation from Ministry of power

a)

Energy conservation by using solar grid at Dr. Kotanis memorial Rly hospital Solapur.

b)

          Energy conservation by correct type capacity pump with solid state starter at WD.

     2

 Provided total  12 Nos High mast tower at various station (DD-6,UMD-3 & PVR-3)

3

100% LED lights provided at22 Stations +59 LC gates

Stations:- Hotagi, Pakni, Mindhewadi, Malikpeth, Pophalaj, Ahmednagar, Vilad, Vambori,Akolner, Nimblak, Rahuri, Belapur, Kopargaon, Pumtamba, Yeola, Sarola, Latur, Sainagr Shirdi, Vakav, Madha,Mohol & KEM+ LC gates in Jeur to DD & DD to YL section) 199 Nos LED Indoor & Outdoor fittings.

4

 04 Nos Solar panel of capacity 04 KWp each provided at Puntamba, Akolner & Rahuri station for pumping & lighting purpose.

5

Trilangual signage boards have been provided at following location:- SUR, DD,KPG,RRI,ANG,SNSI,BAP& LUR.

6

 Replacement of Metal Halide  fittings 400W of High mast tower at SUR, ANG,KPG,SNSI,RII &YL  by LED fittings 200W-83 Nos has been done.

7

Two nos. of DG set commissioned, of 125KVA  at Pandharpr  & 250KVA at Sainagar Shirdi station respectively.




Source : Central Railway / Indian Railways Portal CMS Team Last Reviewed on: 20-04-2017  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.