·ROH outturn: - ROH outturn of 625 wagons during the month (highest monthly figure since Jul’25). The cumulative for current year is 6542 wagons. The ROH cycle time of 10:33 hrs during the month is the best ever figure for last three years. The ROH outturn of BTPN wagons during the current year was 561 wagons which is 117% improvement over last year figure of 258 wagons.
·Freight train examination: - During the month Mar-26, As per the requirement of Traffic, the Goods trains were intensively examined to facilitate easy traffic and improving the earning. Total 281 were intensively examined during month. The average examination time was 4:15 hrs even 3095 wagons “made fit on train” during examination of rakes.
·Controlling of Sick Balance: - With continuous efforts for controlling wagon ineffective by quick response to attend sick wagons, the average wagon ineffective during the month Mar-25 is 1.90% even though 954 sick wagons were repaired during the month.
·Scrap disposal: - Total 2391.495 MT scrap has been disposed. Also, 85 wagons & 18 Coaches condemned in during the year 2025-26, ultimately icmseasing the revenue earning of the Railways.
·Examination of NMG rakes: - During the month Mar-26, total 17 NMG rakeshave been examined. The cumulative figure during the current year is 105 rakes.
·Examination of MEMU trains: In Mar-26, total 38 trips, 03 IA schedule 01 IC and 01 UST have been carried out. Presently 17 rakes are in service and 03 rakes in shed available in the division.
·Fuel economy measure: By close monitoring through REMMLOT as well as by attentive efforts by Power controller, total 661 Nos. DSL locos were shutdown in idling hours resulting into a saving of Rs 2.86 Cr. in the month Mar-26
·Online Monitoring Rolling Stock (OMRS) OMRS consist of Acoustic bearing fault detector and Wheel Condition Monitor. One OMRS was sanctioned for BSL division. The system is installed between WDD – MKU (SEG – BSL) on UP main line on 497/1-3 Kms & Testing of online monitoring of Rolling Stock was carried out on 14.11.2019. also 01 other system is installed between MKU-WDD (BSL - SEG) on DN main line on 497/42 Kms. & Testing of online monitoring of Rolling Stock was carried out on 15.11.2021
·EnHM Wing : EnHM Wing has been awarded with Zonal Efficiency Shield three times in CR. Eco smart stations : Renewal of ISO:14001 Certificationfor Bhusawal, Nasik Road, Manmad, Jalgaon, Chalisgaon, Malkapur, Shegaon, Akola, Badnera, Amravati, Burhanpur & Khandwa is under process Consent to Establish certification for all 12 Eco smart stations has been done & Consent to Operate renewal certification for 09 stations (Bhusawal, Jalgaon, Chalisgaon, Malkapur, Akola, Badnera, Khandwa, Amaravati, & Shegaon) and Manmad & Nashik is pending at MPCB. 01 Station - CTO application of BAU station rejected due to STP not yet to be commissioned Sewage Treatment Plant in operation: 400 KLD capacity in ZRTI / BSL , 4000 KLD capacity in BSL and 500 KLD capacity in MMR, 200 KLD capacity in NKRD, 500 KLD capacity in KNW, 500 KLD capacity in AK and. 500 KLD capacity in AMI. Total plantation in the year 2025-26 : 480 Plants ·Heritage Gallery : Inaugurated the Heritage Gallerynear ATTS (Traffic Training School) open for public from 28.01.2022 for the coming generation to know and understand the history of railways to preserve the old heritage of railways. Where old heritage items of railways are systematically displayed including 01 toy train, Concept Model of Various Trains over Indian Railways, Heritage Dinette, Heritage Steam Engine & Coach etc. |