Year 1974
|
:
|
Workshop was established on 17th May with initial cost of 3.52 Crore & POH Capacity of 40 Locos/Year.
|
|
Year 1974
|
:
|
First Loco was POHed (20930/WAG-4/SER).
|
|
Year 1975
|
:
|
First Loco was Re-cabled.
|
|
Year 1984
|
:
|
POH capacity was icmseased to 80 Locos/Year.
|
|
Year 1986
|
:
|
Incentive Scheme introduced & POH capacity icmseased to 120 Locos/Year.
|
|
Year 1993
|
:
|
Electronic Data Processing Centre opened.
|
|
Year 1999
|
:
|
New Incentive scheme introduced & capacity icmseased to 126 Locos/Year.
|
|
Year 2001
|
:
|
ISO 9001:2000 certification awarded.
|
|
Year 2002
|
:
|
First 3-Phase Passenger Loco (30007/WAP-5/GZB) POHed.
|
|
Year 2003
|
:
|
First 3-Phase Goods (Freight) Loco (31005/WAG-9/ECR) POHed.
|
|
Year 2012
|
:
|
First New Assembled Loco (31314/WAG9H/AQ) built.
|
|
Year 2012
|
:
|
First Tower Wagon (RU-00877/LNL) POHed.
|
|
Year 2013
|
:
|
First DC-AC to 6P AC Conversion (21876/WCAM2/KYN) done.
|
|
Year 2017
|
:
|
IMS (Integrated Management System) Certification received:
üISO : 9001 (Quality Management System)
üISO : 14001 (EMS: Environment Management System)
üISO : 45001(OHSMS: Occupational Health & Safety Management Systems)
|
|
Year 2017
|
:
|
ISO: 50001(EnMS: Energy Management System) was awarded.
|
|
Year 2018
|
:
|
5S- Workplace Management System Certification awarded.
|
|
Year 2018
|
:
|
First 3-Phase Loco under gone Technological Up-gradation.
|
|
Year 2019
|
:
|
ISO: 3834 Quality requirement for Fusion Welding of Metallic Material Certification awarded.
|
|
Year 2020
|
:
|
First time provision of Regenerative Braking (27102/WAG7/KYN)
|
|
Year 2020
|
:
|
First time provision of 2 x 130kVA SIV Unit (22307/WAP4/BSL)
|
|
Year 2020
|
:
|
First time provision of Hotel Load Converters (30292/WAP7/GZB)
|
|
Year 2021
|
:
|
Installation of Effluent Treatment Plant, Daylight Pipes, Hybrid Daylight System with Turbo Ventilators and LED High Mast Lights at Workshop premises.
|
|
Year 2021
|
:
|
Installation of Sewage Treatment Plant, Waste Compost Machine and Rain Water Harvesting at Administrative Building premises.
|
|
Year 2021
|
:
|
First 8W Diesel Electric Tower Car (under slung) assembly work done.(CR202101/Pune/CR)
|
|
Year 2022
|
:
|
First time provision of Composite panel (SR+HLC) (30005 / WAP5 / GZB).
|
|
Year 2022
|
:
|
First time provision of Hand Brake in 8W Diesel Electric Tower Car (under Slung). (CR202113/IGP/CR)
|
|
Year 2024
|
:
|
Installation and Commissioning of 400kWP Solar Panel on Workshop Roof.
|