Electric Locomotive Workshop Bhusawal


 

Year 1974

:

Workshop was established on 17th May with initial cost of 3.52 Crore & POH Capacity of 40 Locos/Year.

Year 1974

:

First Loco was POHed (20930/WAG-4/SER).

Year 1975

:

First Loco was Re-cabled.

Year 1984

:

POH capacity was icmseased to 80 Locos/Year.

Year 1986

:

Incentive Scheme introduced & POH capacity icmseased to 120 Locos/Year.

Year 1993

:

Electronic Data Processing Centre opened.

Year 1999

:

New Incentive scheme introduced & capacity icmseased to 126 Locos/Year.

Year 2001

:

ISO 9001:2000 certification awarded.

Year 2002

:

First 3-Phase Passenger Loco (30007/WAP-5/GZB) POHed.

Year 2003

:

First 3-Phase Goods (Freight) Loco (31005/WAG-9/ECR) POHed.

Year 2012

:

First New Assembled Loco (31314/WAG9H/AQ) built.

Year 2012

:

First Tower Wagon (RU-00877/LNL) POHed.

Year 2013

:

First DC-AC to 6P AC Conversion (21876/WCAM2/KYN) done.

Year 2017

:

IMS (Integrated Management System) Certification received:

üISO : 9001  (Quality Management System)

üISO : 14001 (EMS: Environment Management System)

üISO : 45001(OHSMS: Occupational Health & Safety Management Systems)

Year 2017

:

ISO: 50001(EnMS: Energy Management System) was awarded.

Year 2018

:

5S- Workplace Management System Certification awarded.

Year 2018

:

First 3-Phase Loco under gone Technological Up-gradation.

Year 2019

:

ISO: 3834 Quality requirement for Fusion Welding of Metallic Material Certification awarded.

Year 2020

:

First time provision of Regenerative Braking (27102/WAG7/KYN)

Year 2020

:

First time provision of 2 x 130kVA SIV Unit (22307/WAP4/BSL)

Year 2020

:

First time provision of Hotel Load Converters (30292/WAP7/GZB)

Year 2021

:

Installation of Effluent Treatment Plant, Daylight Pipes, Hybrid Daylight System with Turbo Ventilators and LED High Mast Lights at Workshop premises.

Year 2021

:

Installation of Sewage Treatment Plant, Waste Compost Machine and Rain Water Harvesting at Administrative Building premises.

Year 2021

:

First 8W Diesel Electric Tower Car (under slung) assembly work done.(CR202101/Pune/CR)

Year 2022

:

First time provision of Composite panel (SR+HLC) (30005 / WAP5 / GZB).

Year 2022

:

First time provision of Hand Brake in 8W Diesel Electric Tower Car (under Slung). (CR202113/IGP/CR)

Year 2024

:

Installation and Commissioning of 400kWP Solar Panel on Workshop Roof.

   

 

      ELW Bhusawal Notification -

Source : Central Railway Last Reviewed : 20-05-2026