Achievement of ACCOUNTS DEPARTMENT Mumbai Div for the month
of February 2022 is as
under:-
A)
Finance Section:-
Due
to thorough scrutiny of financial Proposals, Indents & Estimates, savings
to the tune of Rs. 19.44 crores have been
achieved.
Ø
Major Savings:
1.
The estimate of hiring of CCTV
camera for the period of five years at the cost of Rs.20.12 crore,
rates based on BQ was received. The codal life of
CCVT as per Railway Board letter dated 26/02/2021 is 8 years. As such, the cost
of hiring for SITC of CCTV (Dome, Bullet, PTZ and 4K UHD) have been worked out
as depreciated value of the equipment for period of five years plus 35% AMC (7%
per year for five years) and achieved savings of Rs.4.95 crore.
2.
In the estimate of deposit work of
Dharavi Mid section Public FOB achieved savings in
the form of earnings Rs.3.67 crore which includes 30%
maintenance charges (allocation 93242000) and 51% departmental charges
(allocation 93652000)
3.
In the estimate related to AMC of
LHB RMPU (AC coaches) of Mumbai division, the NS items were included more than
the requirement. The same have been
asked to reduced on actual requirement basis. Similarly, the quantity (LHB coaches) for AMC
was considered on anticipated basis in addition to the actual. The same has
been asked to consider on actual basis only and according the estimate has been
revised. With the same saving of Rs. 4.79
crores has been achieved.
Bills Recoverable
Section:-
The following major amount
recovered against Bills raised:
Sr. No |
Party Name |
Bill Type |
Amount (Rs. In Lakhs) |
1 |
Adani
Transmission |
WAYLEAVE |
383.03 |
2 |
Dinesh
Engineering |
WAYLEAVE |
1.80 |
3 |
Torrent Power |
Land License |
6.12 |
B)
Revenue and Capital Expenditure :-Working Expenses (Demand 03 to 13):
(Rs. in.
Crs.)
Revenue D. No. 3 to 13 |
Expenditure for the month of January 2021 |
Expenditure to end of January 2022 |
||||
|
Actual January 21 |
Actual January 22 |
Variation (%) |
Actual January 21 |
Actual January 2022 |
Variation (%) |
|
257.36 |
309.06 |
20.09 |
2446.43 |
2877.380 |
17.62 |
Works (Exp.) |
17.58 |
32.13 |
82.75 |
374.60 |
483.48 |
29.06 |
C)
Bill
passed and amount for the month of February 2022.
SECTION |
NO. OF BILL PASSED |
AMOUNT IN CR. |
EXP |
224 |
55.03 |
Stores Bills |
284 |
6.05 |
Petty Bills |
1019 |
7.18 |
D)
Achievements:
Ø Expenditure Section:- An amount of Rs. 8.98 Lakh has been recovered from ON Account Bills of
contractors during the month of February 2022 on account of deduction of
penalty, bill charges, vetting charges etc.
Assistance
Required from HQ:-
·
As against 9 sanctioned posts of ASVs only two posts of ASV are being
operated. Vacancies of ASVs (7 posts) required to be filled up urgently for
stock verification and witnessing of scarp sale.
·
One ISA is also required for timely clearance of LOT Inspections.
·
As against 52 vacant posts in clerical staff, due to retirement and
termination of services of re-engaged staff, acute shortage is being faced.
·
For smooth functioning of the office, a bare minimum of 16 staff (AA/ A/cs Clerk) is required. Section wise requirement is
mentioned against each section viz. Expenditure section (3), Finance section
(2), Admin section (2), Pension & Settlement section (5)
& Pay
sheet section (4).