* | Knurling type Centre Grab pole in door way provided in all Siemens EMU rakes for safety of passenger. |
* | As a part of preventive action to avoid recurrence of untoward incidents resulting into death/injury in railway premises awareness poster have been prepared by Commercial department and same pasted / Displayed at prominent locations inside the EMU coaches. |
* | 09 Nos. Bombardier rakes received from Western Railway & and 25 Nos. new Bombardier rakes received from ICF. These rakes commissioned and inducted in service after implementing all Reliability Action Plan. |
* | All Siemens EMU Siemens Cabs of Kurla Carshed based rakes has been provided with LED main head light in D’cab for better visibility as lux level has increased from 4950 to 8000 and Human death on account of low head light has reduced. |
* | All panto pans with copper strips replaced with Carbon strips in all rakes. |
* | Audio alert provided in D’Cab for alertness of train crew after passing yellow signal. After this modification SPAD cases will reduce. |
* | One Additional 15 car EMU rake has inducted in service on 03.03.2019 on Main Line. Rectification and modification work of newly 15 Car rake has done by Carshed staff. |
* | 500 KW solar panel fitment work completed in Dec-2018 on the roof shed of Kurla, Kalva & Sanpada Carshed which has reduced Energy bill of carshed. |
* | EMUs carshed has provided LED Lights & LED lamps in New yard / Inspection shed which has improved lux level without increasing energy bill. |
* | Siemens Rake IA Schedule activity was started at Pune Carshed from 20th November 2019. 02Nos. Siemens Rake’s IA Schedule was carried out during this month (on 20.11.19 & 26.11.19). A group Cash Award of Rs. 10,000/- each is sanctioned by PCME Sir for the staff of Kalva Carshed and Pune Carshed. |
* | Fully air conditioned BHEL EMU rake with Unit no: 198705-198713-198714-198715-198716-198709-198710-198717-198718-198719-198720-198706 was inaugurated by Minister of State Railways and its first service was operated between PNVL to THANE (Trans-harbour) route on 30.01.2020. |
* | UMID (Unique Medical Identity card, A Smart Health card system in Indian Railways) camp was arranged in EMU Sheds. All Shed staff along with family member’s data were updated during the camp. Till date 100 % Supervisors & staffs were registered under UMID successfully. |
* | Commissioning 3 phase EMU Rakes fitted with Medha Electrics: 04 Nos. 3 phase EMU Rakes fitted with Medha Electrics received from SCR during the month of Oct-2019 and commissioning activities as per Central Railway Formation is completed in all rakes inducted in passenger services during the month of Oct-2020 |
* | ULTRA-MODERN ‘UTTAM’ EMU RAKE Mumbai suburban Central Railway local trains network has got an all new swanky and state-of-the-art ‘Uttam’ EMU (Electric Multiple Unit) fitted with Medha electrics. The ultra-modern ‘Uttam’ EMU rake has a three-phase IGBT-based propulsion system. The Uttam rake is well equipped with passenger-friendly facilities in order to provide a better experience for commuters. The new Uttamrake received by Central Railway from ICF and inducted in passenger services in Mumbai suburban in Central Railway on DT: 20-10-2020. |
| Some of the Salient Features of the new Uttam Medha EMU rake are |
i) | CCTV camera provided in both cabs near headlight to have motorman front view and guard side back view of track area. |
ii) | CCTV camera provided outside the cab gives platform view to guard. |
iii) | CCTV cameras provided in all coaches. |
iv) | Display provided in guard cab where live streaming of all CCTV cameras can be seen. |
v) | Easy to operate Push button provided for Alarm Chain pulling. |
vi) | Full LED lights in all coaches. |
vii) | Aesthetically designed FRP seats in second class compartments. |
viii) | More comfortable cushion seats with more heighted back rest in first class compartments. |
ix) | Compartments, isolation partitions, roof interior made of FRP in passenger area which gives pleasant look inside coach. |
x) | Ergonomically designed End wall panels in passenger area. |
xi) | Newly designed FRP luggage carrier. |
* | The following preventive action taken by EMU carsheds to fight against CORONA VIRUS. |
i) | Disinfectant and sanitation of all EMU rakes during night stabling in various stabling sidings and carsheds. |
ii) | Public awareness by vinyal wrapping on the exterior of EMU rakes. |
iii) | Passengers awareness by pasting posters inside the EMU coaches. |
iv) | Audio visual announcement through internal display for awareness of passengers inside the EMU coaches. |
v) | Protection of staff started through temperature screening of artisans staff at time office and for supervisor in PPIO section. |
vi) | Distribution of Mask and sanitizers to the staff. |
* | Micro-processor based VVVF drive AC Traction motor bogie testing plant commissioned at KCS in Oct-2020. |
* | Fully air conditioned BHEL EMU rake first service introduced in Main Line route on Dec-2020. |
* | 01 NO. 3phase MEMU Bombardier rake commissioned at Kalva carshed and inducted in passenger service. |