C. ACHIEVEMENTS 2017-18
1. 100% LED lights are provided at 89 Stations (excluding CIDCO maintained stations) of Mumbai Division.
2. 34 Nos. Escalators & 27 Nos. FOB Lifts provided at various stations.
3. 10 Nos. High Volume Low Speed (HVLS) fans at CSMT concourse area have been provided.
4. 168.3 KWp capacity Solar Power Plant and 35.7 KWp Solar+Wind mill have been installed.
5. Asangaon Station is converted into green energy station powered by solar energy.