Milestones

·ROH outturn:-

      The ROH outturn during the month Aug’22 was 375 wagons has been done in the Division. The cumulative figure during the current year is 1887.

 

·Freight train examination in BSL yard:-

     During the month Aug’22, total 204 freight trains were intensively examined. Cumulative figure of the current year is 1111 trains. Also total 2074 wagons were “made fit” on train and avoid the detachment.

·Controlling of sick balance:-

      The wagon ineffective during the month Aug’22 was 1.31% on mechanical sick account.

 

·Certification of BTPN load at PNV:

      During the month Aug’22, total 105 BTPN rakes were loaded at PNV. The cumulative figure during the current year is 507 rakes.Also, 1752 BTPN wagons were given MS fit for loading during the month Aug’22.

 

·Scrap disposal:

      Total 443.928 MT scrap has been disposed upto the month Aug’22. Also, 53 wagons & 14 coaches condemned in year 22-23.

 

·Examination of NMG rakes:

      During the month Aug’22, total 11 NMG rakes have been examined. The cumulative figure during the current year is 49 rakes

 

·Examination of Kisan Express –

      During the Month Aug’22, total 01 Kisan rakes of the train were examined. The cumulative figure during the current year is 29 trains


·Examination of Millennium/(VPs) trains:

     During the Month Aug’22, total 13 Millennium train were examined.The cumulative figure during the current year is 59.


 ·Fuel economy measure:

      By close monitoring through REMMLOT as well as by attentive efforts by Power controller, 409 Goods, 564 passenger & 42 shunting DSL Locos were shut down in idling hours resulting into a saving of approx. 202325 litre HSD oil (i.e Rs 2.25 Crore approx.) during Aug’22.

 ·Introduction of MEMU trains:

    Total 09 Nos. of ICF-Medha, 01 No. of ICF Bombardier & 06 Nos. of BEML-Bombardier Rakes of 8-Car formation are being maintained in coaching complex BSL. They have replaced Loco hauled Conventional Passenger Trains.

·Quick Watering of Trains at Station :

     Quick water supply on all platforms (from 1 to 8) of BSL station has been made operational from 12/01/2021.

·Online Monitoring Rolling Stock (OMRS)

      OMRS consist of Acoustic bearing fault detector and Wheel Condition Monitor. One OMRS was sanctioned for BSL division. The system is installed between WDD – MKU (SEG – BSL) on UP main line on 497/1-3 Kms & Testing of online monitoring of Rolling Stock was carried out on 14.11.2019. also 01 other system is installed between MKU-WDD (BSL - SEG) on DN main line on 497/42Kms. & Testing of online monitoring of Rolling Stock was carried out on 15.11.2021

 

·EnHM Wing :

       EnHM Wing has been awarded with Zonal Efficiency Shield three times in CR.

    Eco smart stations : Bhusawal, Nasik Road, Manmad, Jalgaon, Chalisgaon, Malkapur, Shegaon, Akola, Badnera, Amravati, Burhanpur & Khandwa has been certified as ISO 14001:2015 for Environment Management system.

     Consent to Establish certification for all 12 Eco smart stations has been done & Consent to Operate certification for 09 stations is under process.

     Sewage Treatment Plant in operation : 400 KLD capacity in ZRTI / BSL , 4000 KLD capacity in BSL and 500 KLD capacity in MMR, 200 KLD capacity in NKRD, 500 KLD capacity in KNW

      Sewage Treatment Plant under commissioning: AK & AMI (500 KLD capacity each)

      Tree Plantation :

Place

Plantation done

Live plant

At Miyawaki (Atal Ghan Van Yojna) Near ROH BSL

15000 plants

14218plants

BSL to AchegaonDense Forest

5000 plants

3045 Plants

BSL Rly gate near ROH Depot

4444 plants

2671 Plants

Total plantation in the year 2022-23 : 19959 plants

 ·Heritage Gallery :

     Inaugurated the Heritage Gallerynear ATTS (Traffic Training School) open for public from 28.01.2022 for the coming generation to know and understand the history of railways to preserve the old heritage of railways. Where old heritage items of railways are systematically displayed including 01 toy train, Concept Model of Various Trains over Indian Railways, Heritage Dinette, Heritage Steam Engine & Coach etc.





Source : Central Railway / Indian Railways Portal CMS Team Last Reviewed : 28-09-2022  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.